Cavendish Blvd. northbound will be reduced to one lane north of Côte Saint-Luc Rd. The sidewalk will also be blocked to pedestrians. If the work is not finished during the work hours of 9 am to 4 pm, the equipment will be moved and the road and sidewalk will be opened outside of work hours.


Duration: January 30, and February 13 to 14, 2020

Cause: Work to be done on the roof of 5505 Cavendish Blvd. and maintenance on the elevator system. Two lanes are required for the crane.