Lane reduction on eastbound Côte Saint-Luc Rd between Cavendish and Borden from July 15 to 17

This notice of disruption has been archived.
Information identified as archived is provided for reference.
See latest Maintenance and disruptions announcements.

Côte Saint-Luc Rd. eastbound will be reduced from three lanes to two lanes between Cavendish Blvd. and Borden Ave. from Monday, July 15 to Wednesday, July 17, 2019. The city’s contractor will be repairing two catch basins on that block. A catch basin (sometimes called a storm drain) is a drainage structure with the sole function of collecting rainwater and snowmelt from streets.