1. Announcements
  2. /
  3. Road work
  4. /
  5. Côte Saint-Luc Road underpass:...

Côte Saint-Luc Road underpass: lane reduction (October 15 to 22, 2024)

This post is archived and may contain outdated information.
  • Reduction of the lanes at the Côte Saint-Luc Road underpass.
  • Sidewalk on south side will be blocked at underpass, pedestrians will have to cross to use the sidewalk on the other side.

Timeframe : Oct 15 – Oct 22, 7 a.m. – 7 p.m.

Reason: Demolition of a building on Robert-Burns Street in the Borough of CDN-NDG