The decisions the City makes affect your life each day.
Share your ideas so we can build an even better Côte Saint-Luc.

  1. Engage
  2. /
  3. Transit First: Cavendish–Namur–De la...

Transit First: Cavendish–Namur–De la Savane

About

A north-south Cavendish Blvd. link is the missing piece in the island of Montreal road network. Initial discussions on connecting its two parts started in the mid 1960s and major studies were done in 1981, 1988, 1992, 1995, 1996 and 2000.

The goal of the Cavendish extension project is to complete the road network to:

  • Create north-south link from Côte Saint-Luc to Borough of Saint-Laurent
  • Create east-west link to Décarie Blvd.

The Cavendish link will improve accessibility to, from and within this sector for all means of transport and to ensure that the traffic conditions are conducive to the economic prosperity and well-being of residents.

Maps

The green circle represents the end of Cavendish Blvd. in Côte Saint-Luc. The yellow circle represents the end of Royalmount in TMR. The red circle represents the end of Cavendish in Saint-Laurent.

History

In the early 1960s, the Cavendish extension generally referred to the road’s push north from Fleet Rd., past the railway tracks and towards what were then empty fields. The first step was to extend it north to the St. Luc Rail Yards, which is what indeed happened. The second step, was to go even farther north, over the rail yards and towards Ville Saint-Laurent, Hwy 520, Hwy 40, and Hwy 13 in time for the 1967 World’s Fair.

The project stalled and eventually opposition from previous administrations of Côte Saint-Luc kept the project off the radar. However, since 1998, the city has supported re-launching the project. City officials have the governments of Montreal, Quebec and Canada, presented numerous briefs, passed resolutions and kept the issue front and centre.

The City of Côte Saint-Luc believes it is imperative that there be a coordinated effort with all public and private stakeholders to improve the transportation for the entire Namur–De la Savane District, which includes part of the City of Côte Saint-Luc, the Town of Mount Royal, and the Montreal boroughs of Saint-Laurent and Côte-Des-Neiges–Nôtre-Dame-de-Grace. This must include (i) public and active transit that provides rapid service and is easily accessible, and (ii) a logical and connected street grid that links these neighbourhoods together.

News

December 17, 2020

  • Agglomeration of Montreal adopts unanimous resolution to request the ARTM implement an appropriate electric public transit service in the expanded sector of Namur-De la Savane, including along Cavendish Boulevard

February 17, 2020

Documents

City of Côte Saint-Luc

Montréal

Reports

Alliance Cavendish-Affaires

Timeline

20 juin 2018

CSL hosts meeting of West End mayors to discuss traffic in our area

16 jan. 2019

CSL presents brief at Royalmount project hearings

28 mai 2019

Release of Rapport du groupe de travail Namur-De la Savane by Professeure Florence Junca-Adenot

13 fév. 2020

News conference to announce creation of joint committee to develop a transit plan for the area that will adequately serve the new developments

17 fév. 2020


CSL presents Transit First brief to OCPM hearings in Hippodrome-Namur development (PDF, audio and slides)

17 fév. 2020

Four mayors send letter to Quebec Minister for Transport and the Mayor of Montreal

17 déc. 2020

Agglomeration of Montreal resolution requesting the ARTM implement an appropriate electric public transit service in the expanded sector of Namur-De la Savane, including along Cavendish Boulevard

Help us improve our website. Use this form to report a problem related to the clarity, functionality, or accessibility of this page.

⚠️ This form is only for reporting technical or clarity issues on the website.
❌ Other requests will not be processed through this form.
→ For service-related inquiries, please email [email protected].
→ To comment on City policies, please email [email protected].