1. Projects
  2. /
  3. Infrastructure projects – Summer...

Infrastructure projects – Summer 2024

Road infrastructure work (including replacement of the public section of a water service pipe, road resurfacing and sidewalk reconstruction) took place on the following streets:

  • Wentworth (Kildare to Mackle)
  • Westluke (Wavell to Guelph)
  • Smart (Arcadian to CP Rails)
  • Arcadian

Additionally, we have repaired 1700m2 of sidewalks throughout the city.